From Energy to Hashrate
A Visual Walkthrough of the Full Build Process
Mining Farm 101 Overview
Understand the core logic in minutes: power, cooling, and operations. Master the concepts first, then dive into the details.
⚡ Power Drives Cost and Stability
Target capacity determines transformers, distribution, and cabling. Grid stability affects hashrate uptime.
〰 Cooling Impacts Efficiency and Lifespan
Cooling choices define PUE, noise, and maintenance effort, and affect device longevity and OC headroom.
∿ Operations Determine Uptime
Networks, spares, and inspections drive recovery speed and shape long-term returns.
📘 Quick Glossary
⇄ Selection Cheat Sheet
Energy Sourcing: Three Paths Explained
⚡ Grid Supply (Grid)
Flow: high-voltage input -> transformer -> distribution
Transformer Selection Guide
A unique grid step: step down 10/35kV transmission to miner-friendly 415V/380V.
Fire-safe and robust. Integrates inside the container to reduce low-voltage cable losses.
Weather-resistant with strong heat dissipation, ideal for outdoor substations and lower cost.
🔥 Gas Generation (Gas Genset)
Flow: gas source -> pretreatment -> gas genset -> distribution
Designed for Associated Gas
The key is the upstream scrubber. Remove H2S and moisture to protect engines. Depending on output voltage and distribution, a secondary transformer may be unnecessary.
🔗 Jingle Gas Power Solution
Modular containerized gensets across power ranges, bundled with full pretreatment systems.
View genset details ↗☀ Solar/Wind (Solar & Wind)
Flow: solar/turbine -> inverter -> battery -> distribution -> miners
Why BESS is Required
Renewables are intermittent. Without storage, voltage swings can damage hashboards.
🔋 System Building Blocks
Cooling Decisions: Principles and Live Demos
We go beyond concepts to show real physics. From air convection to dual-loop liquid exchange, every solution has its own logic.
? What is PUE (Power Usage Effectiveness)?
💨 Traditional Air Cooling
Negative pressure duct / evaporative curtain
- Lowest build cost
- Mature tech, easy maintenance
- High noise risk for neighbors
- Higher PUE (1.3-1.4), more wasted power
💧 Hydro Cooling
Dual loop / liquid heat exchange
- Higher initial cost
- Requires professional water maintenance (CDU)
🌊 Immersion Cooling
Full immersion / extreme cooling
- Ultra-low PUE (<1.05)
- Isolates oxidation/dust, long lifespan
- Supports high OC headroom
- Highest build cost
- Maintenance is complex (messy oil)
Heat Recovery: Second Life of Energy
Mining should not only consume energy—it should also produce heat. With advanced heat exchange, high-grade heat can serve homes or industry, unlocking second-use value.
Home Use: Bitcoin Heater
Use a Jingle silent air miner as a winter heat source. Earn BTC while heating—offsetting electricity costs under the right conditions.
- Home Heating
- Clothes Drying
Industrial & Agriculture: Scaled Heating
Use 60°C+ hot water from hydro/immersion systems to replace gas or electric boilers and cut operating costs.
Site Infrastructure: The Final Puzzle
JingleMining delivers core hardware plus complete infrastructure. Choose rapid container deployment or cost-efficient retrofits.
All-in-One Container
Factory-built with distribution, PDU, network switches, exhaust fans, and hot/cold aisle.
On-site: just plug power and network to start.
Retrofit Kit
Turn idle warehouses into standard mining farms with modular components.
Ops Pitfalls: Key Construction & O&M Know-how
These basics are often overlooked but crucial. Master them to judge stability and compliance.
🔌 Electrical Basics
- ✓ZR-YJV Flame-Retardant CableUse XLPE insulated flame-retardant cables to avoid fire risks from ordinary PVC.
- ✓Regular Thermal InspectionsScan terminals to find hotspots early and avoid failures from poor contacts.
💧 Water Quality
- 🛡Inner Loop
- ✓Outer Loop
🌐 Network Basics
- ✓Dual-WAN RedundancyPrimary fiber + backup Starlink/4G to reduce hashrate downtime.
- 🛡VLAN IsolationPhysically separate production and management networks to prevent full-site spread.
📦 Spare Parts Inventory
- ℹRepairs often take 20-30 days. To protect uptime, stock:
- 2% Spare PSUs
- 5% Spare Fans
- 1% Control Boards
🖥 Management Tools
Use vendor tools (e.g., BTC Tools) for batch pool configs and firmware updates.
🌡 Environment Control
- 💧Dew Point Monitoring
- 〰Clean the Water CurtainCurtains trap dust but clog with sludge. High-pressure cleaning is required to prevent overheating.
Project Timeline
From planning to live hashrate, typical delivery is 8-12 weeks. JingleMining offers turnkey delivery.
Solution Design
Requirements, site evaluation, drawings
1 weekFactory Production
Container prefab, transformer customization, testing
2-4 weeksGlobal Logistics
Sea/land freight, customs clearance (DDP)
4-6 weeksOn-site Deployment
Lifting, wiring, network commissioning, go-live
1 weekFAQ
Q: Do you handle global shipping and customs?▾
Yes. JingleMining has a mature global logistics network and supports DDP delivery across the Americas, Central Asia, Southeast Asia, and more.
Q: Can prefab containers mix different miner models?▾
Yes, with notice. We customize rack spacing and PDU layout based on model sizes (e.g., S19 vs M30) and power.
Q: What is the warranty period?▾
Core infrastructure (containers, transformers, switchgear) typically carries a 1-year warranty. For key components (fans, PDUs), we recommend spare kits for emergencies.
Q: Do you offer hosting services?▾
Q: What payment methods are supported?▾
We support flexible payments including bank wires (USD/EUR) and crypto (USDT/BTC). Large orders can use formal international trade contracts.
Q: Is there a minimum order quantity (MOQ)?▾
For miners only, MOQ is typically 5-10 units. For containers or infrastructure retrofits, MOQ is 1 container or 1MW. We welcome all scales.
Q: What about compliance and ROI evaluation?▾
Projects must meet local power, environmental, noise, fire, and safety regulations. Returns depend on power price, coin price, hashrate, efficiency, uptime, and O&M.
Q: Are your devices compatible with local voltages?▾
Yes. Our containers and PDUs are customized for global standards (e.g., 480/277V, 415/240V, 400/230V, 380/220V, 208/120V). Engineers confirm your local grid before ordering.